{"product_id":"pet-leashes-rope-outdoor-training-running-dog-leash-belt-dogs-lead-for-small-and-large-dog-long-lead-training-leash-long-line-dog-leash-great-for-dog-puppy","title":"Pet Leashes Rope Outdoor Training Running Dog Leash Belt  Dogs Lead For Small And Large Dog Long Lead-Training Leash\/Long Line Dog Leash Great for Dog\/Puppy","description":"\u003cp\u003e \u003cstrong\u003eDescription:\u003c\/strong\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cul class=\"a-unordered-list a-vertical a-spacing-mini\"\u003e\n\u003cli\u003e\u003cspan class=\"a-list-item\"\u003e\u003cstrong\u003eLIGHTWEIGHT AND NOT ABSORB WATER-\u003c\/strong\u003e Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan class=\"a-list-item\"\u003e\u003cstrong\u003eGREAT DESIGN-\u003c\/strong\u003e The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLONG DOG LEAD-\u003c\/strong\u003e  Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eBrand Name:\u003c\/strong\u003e STEVVEX Pets\u003cbr\u003e \u003cstrong\u003eModel Number:\u003c\/strong\u003e ST12DB786GBI\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eType\u003c\/strong\u003e: Leashes\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eDog Leash Type:\u003c\/strong\u003e Basic Leashes\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eMaterial:\u003c\/strong\u003e Nylon\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eType:\u003c\/strong\u003e Dogs\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eSeason:\u003c\/strong\u003e All seasons\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003ePattern:\u003c\/strong\u003e Solid\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eFeature:\u003c\/strong\u003e Personalized\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eFeature:\u003c\/strong\u003e outdoor training dog leash rope\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eUse for:\u003c\/strong\u003e puppy, small medium and large dog belt\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eUse for 1:\u003c\/strong\u003e training, running dog lead\u003c\/span\u003e\u003c\/p\u003e","brand":"Stevvex","offers":[{"title":"Black \/ S 1.5m","offer_id":50765907263735,"sku":"42288796-black-s-1-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Black \/ XS 1.2m","offer_id":50765907296503,"sku":"42288796-black-xs-1-2m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Black \/ L 3m","offer_id":50765907329271,"sku":"42288796-black-l-3m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Black \/ M 1.8m","offer_id":50765907362039,"sku":"42288796-black-m-1-8m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Black \/ XL 4.5m","offer_id":50765907394807,"sku":"42288796-black-xl-4-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Black \/ 2XL 6m","offer_id":50765907427575,"sku":"42288796-black-2xl-6m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Black \/ 3XL 10m","offer_id":50765907460343,"sku":"42288796-black-3xl-10m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Green \/ S 1.5m","offer_id":50765907493111,"sku":"42288796-green-s-1-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Green \/ XS 1.2m","offer_id":50765907525879,"sku":"42288796-green-xs-1-2m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Green \/ L 3m","offer_id":50765907558647,"sku":"42288796-green-l-3m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Green \/ M 1.8m","offer_id":50765907591415,"sku":"42288796-green-m-1-8m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Green \/ XL 4.5m","offer_id":50765907624183,"sku":"42288796-green-xl-4-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Green \/ 2XL 6m","offer_id":50765907656951,"sku":"42288796-green-2xl-6m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Green \/ 3XL 10m","offer_id":50765907689719,"sku":"42288796-green-3xl-10m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Red \/ S 1.5m","offer_id":50765907722487,"sku":"42288796-red-s-1-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Red \/ XS 1.2m","offer_id":50765907755255,"sku":"42288796-red-xs-1-2m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Red \/ L 3m","offer_id":50765907788023,"sku":"42288796-red-l-3m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Red \/ M 1.8m","offer_id":50765907820791,"sku":"42288796-red-m-1-8m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Red \/ XL 4.5m","offer_id":50765907853559,"sku":"42288796-red-xl-4-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Red \/ 2XL 6m","offer_id":50765907886327,"sku":"42288796-red-2xl-6m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Red \/ 3XL 10m","offer_id":50765907919095,"sku":"42288796-red-3xl-10m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Blue \/ S 1.5m","offer_id":50765907951863,"sku":"42288796-blue-s-1-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Blue \/ XS 1.2m","offer_id":50765907984631,"sku":"42288796-blue-xs-1-2m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Blue \/ L 3m","offer_id":50765908017399,"sku":"42288796-blue-l-3m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Blue \/ M 1.8m","offer_id":50765908050167,"sku":"42288796-blue-m-1-8m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Blue \/ XL 4.5m","offer_id":50765908082935,"sku":"42288796-blue-xl-4-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Blue \/ 2XL 6m","offer_id":50765908115703,"sku":"42288796-blue-2xl-6m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Blue \/ 3XL 10m","offer_id":50765908148471,"sku":"42288796-blue-3xl-10m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Pink \/ S 1.5m","offer_id":50765908181239,"sku":"42288796-pink-s-1-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Pink \/ XS 1.2m","offer_id":50765908214007,"sku":"42288796-pink-xs-1-2m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Pink \/ L 3m","offer_id":50765908246775,"sku":"42288796-pink-l-3m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Pink \/ M 1.8m","offer_id":50765908279543,"sku":"42288796-pink-m-1-8m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Pink \/ XL 4.5m","offer_id":50765908312311,"sku":"42288796-pink-xl-4-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Pink \/ 2XL 6m","offer_id":50765908345079,"sku":"42288796-pink-2xl-6m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Pink \/ 3XL 10m","offer_id":50765908377847,"sku":"42288796-pink-3xl-10m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Fruit-green \/ S 1.5m","offer_id":50765908410615,"sku":"42288796-fruit-green-s-1-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Fruit-green \/ XS 1.2m","offer_id":50765908443383,"sku":"42288796-fruit-green-xs-1-2m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Fruit-green \/ L 3m","offer_id":50765908476151,"sku":"42288796-fruit-green-l-3m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Fruit-green \/ M 1.8m","offer_id":50765908508919,"sku":"42288796-fruit-green-m-1-8m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Fruit-green \/ XL 4.5m","offer_id":50765908541687,"sku":"42288796-fruit-green-xl-4-5m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Fruit-green \/ 2XL 6m","offer_id":50765908574455,"sku":"42288796-fruit-green-2xl-6m","price":16.95,"currency_code":"EUR","in_stock":false},{"title":"Fruit-green \/ 3XL 10m","offer_id":50765908607223,"sku":"42288796-fruit-green-3xl-10m","price":16.95,"currency_code":"EUR","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0622\/6349\/2855\/files\/pet-leashes-rope-outdoor-training-running-dog-leash-belt-dogs-lead-672.webp?v=1778616374","url":"https:\/\/winxwheels.com\/fr-fr\/products\/pet-leashes-rope-outdoor-training-running-dog-leash-belt-dogs-lead-for-small-and-large-dog-long-lead-training-leash-long-line-dog-leash-great-for-dog-puppy","provider":"winxwheels","version":"1.0","type":"link"}